• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
Free ACCA & CIMA online courses from OpenTuition

Free ACCA & CIMA online courses from OpenTuition

Free Notes, Lectures, Tests and Forums for ACCA and CIMA exams

  • ACCA
  • CIMA
  • FIA
  • OBU
  • Books
  • Forums
  • Ask AI
  • Search
  • Register
  • Login
  • ACCA Forums
  • Ask ACCA Tutor
  • CIMA Forums
  • Ask CIMA Tutor
  • FIA
  • OBU
  • Buy/Sell Books
  • All Forums
  • Latest Topics

20% off ACCA & CIMA Books

OpenTuition recommends the new interactive BPP books for March and June 2025 exams.
Get your discount code >>

Attitude to risk

Forums › Ask ACCA Tutor Forums › Ask the Tutor ACCA PM Exams › Attitude to risk

  • This topic has 1 reply, 2 voices, and was last updated 11 years ago by John Moffat.
Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • May 21, 2014 at 5:40 pm #169960
    zaca
    Member
    • Topics: 18
    • Replies: 37
    • ☆☆

    In a solution kit,
    They said
    If he is a “sore loser”, then the minimax regret approach suggest.

    Would you please explain for me the meaning of ” sore loser”, I look up the dictionaty and found ” sore loser” is a kind of bad behavior, not fair play behaviour after losing a match..
    And i really stuck in understanding this sentence, and why mimiax regret is suitable for “sore losser”

    In my understanding, Risk neutral is only take care about the highest return and regardless of risk, so Expected value is suitable for them because it dictates the highest value return option and ingore the range of possible out come with assigned probability.( average value)
    but in the solution kit they said : IF they like longterm -reuslt rather than shorterm with uncertainty assigned. They will choose the EV, Wolud you explain for me the relationship between EV with longterm outcome.

    May 21, 2014 at 6:22 pm #169967
    John Moffat
    Keymaster
    • Topics: 57
    • Replies: 54660
    • ☆☆☆☆☆

    I don’t know which book you read it in, but the wording is terrible!!
    (what you found about ‘sore loser’ is true and really is not applicable to decision making under uncertainty).
    What you have written about expected value approach is not correct.

    The real explanation of all the terms is as follows:

    Maximin – is a risk avoider (they are making sure they get the best of the worst results whatever happens, even though they are missing out on the possibility of getting much better).

    Maximax – this is a risk seeker. They are aiming for the best possible return, but taking a risk that they may end up with the worst result.

    Minimax regret – this is again a risk avoider. It is very difficult to explain why in a few words – they are comparing the various returns with each other. If you watch my free lecture, there I do explain in detail what it is and why it is a risk avoider.

    Expected value – this is risk neutral. The decision is based on the average and ignores the fact that it might be higher or might be lower. As an example of this, suppose one option gave either 140 or 160 with 50% probabilities of each – the expected value would be 150. Suppose another one gave 100 or 200 with 50% probabilities of each – again the expected value would be 150.
    So on expected values you would be indifferent between the two. However this is ignoring the fact that the actual return might be a lot higher or a lot lower with the second choice – it is ignoring the risk.

  • Author
    Posts
Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.
Log In

Primary Sidebar

Donate
If you have benefited from our materials, please donate

ACCA News:

ACCA My Exam Performance for non-variant

Applied Skills exams is available NOW

ACCA Options:  “Read the Mind of the Marker” articles

Subscribe to ACCA’s Student Accountant Direct

ACCA CBE 2025 Exams

How was your exam, and what was the exam result?

BT CBE exam was.. | MA CBE exam was..
FA CBE exam was.. | LW CBE exam was..

Donate

If you have benefited from OpenTuition please donate.

PQ Magazine

Latest Comments

  • Kim Smith on IASB Conceptual Framework – Introduction – ACCA Financial Reporting (FR)
  • Farhaan on Project management – ACCA Strategic Business Leader (SBL)
  • Ken Garrett on Professionalism, ethical codes and the public interest – ACCA Strategic Business Leader (SBL)
  • thienan0110 on Interest rate risk management (1) Part 5 – ACCA (AFM) lectures
  • Venoth on Time Series Analysis – ACCA Management Accounting (MA)

Copyright © 2025 · Support · Contact · Advertising · OpenLicense · About · Sitemap · Comments · Log in