• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
Free ACCA & CIMA online courses from OpenTuition

Free ACCA & CIMA online courses from OpenTuition

Free Notes, Lectures, Tests and Forums for ACCA and CIMA exams

  • ACCA
  • CIMA
  • FIA
  • OBU
  • Books
  • Forums
  • Ask AI
  • Search
  • Register
  • Login
  • ACCA Forums
  • Ask ACCA Tutor
  • CIMA Forums
  • Ask CIMA Tutor
  • FIA
  • OBU
  • Buy/Sell Books
  • All Forums
  • Latest Topics

20% off ACCA & CIMA Books

OpenTuition recommends the new interactive BPP books for March and June 2025 exams.
Get your discount code >>

F5 throughput accounting BPP question ( bottleneck )

Forums › ACCA Forums › ACCA PM Performance Management Forums › F5 throughput accounting BPP question ( bottleneck )

  • This topic has 2 replies, 3 voices, and was last updated 2 years ago by awidana.
Viewing 3 posts - 1 through 3 (of 3 total)
  • Author
    Posts
  • November 1, 2017 at 10:57 am #414028
    abobakr2017
    Participant
    • Topics: 1
    • Replies: 0
    • ☆

    F Co makes and sells two products, A and B, each of which passes through the same automated
    production operations. The following estimated information is available for period 1.
    Product unit data
    A B
    Direct material cost ($) 2 40
    Variable production overhead cost ($) 28 4

    Original estimates of production/sales of products A and B are 120,000 units and 45,000 units
    respectively. The selling prices per unit for A and B are $60 and $70 respectively.

    Maximum demand for each product is 20% above the estimated sales levels.

    Total fixed production overhead cost is $1,470,000. This is absorbed by products A and B at an average
    rate per hour based on the estimated production levels.
    One of the production operations has a maximum capacity of 3,075 hours which has been identified as a
    bottleneck, limiting the overall estimated production/sales of products A and B. The bottleneck hours
    required per product unit for products A and B are 0.02 and 0.015 respectively.

    b) qustion : If F Co chooses to prioritise Product B, calculate the value (in $) of the maximum net profit.

    b) solution :
    Determine profit-maximising product mix
    Hours Hours Units of
    Product Demand required available production
    B 45,000 * 1.2 = 54,000 (* 0.015) =810 810 (* 0.015) 54,000
    A 120,000 * 1.2 = 144,000 (* 0.02) =2,880 2,265 (* 0.02) 113,250
    3,690 3,075
    My qustion is how did they calculate the demand this way (45,000 * 1.2) , and how did he get this (1.2) from the above data ??????
    please and thanks alot for helping me …

    November 2, 2017 at 7:00 am #414089
    John Moffat
    Keymaster
    • Topics: 57
    • Replies: 54660
    • ☆☆☆☆☆

    The question says that the original estimate of demand for B was 45,000. It also says that the maximum demand is 20% higher.

    45,000 x 1.2 is another way of getting 45,000 + (20% x 45,000).

    March 20, 2023 at 11:12 pm #681596
    awidana
    Participant
    • Topics: 0
    • Replies: 2
    • ☆

    Using throughput analysis, calculate the return per bottleneck hour of Product A.
    (10 marks)
    d. If F Co choose to prioritize the manufacture of Product A, calculate the value (in $)
    of the maximum net profit using throughput analysis. (10 marks)

  • Author
    Posts
Viewing 3 posts - 1 through 3 (of 3 total)
  • You must be logged in to reply to this topic.
Log In

Primary Sidebar

Donate
If you have benefited from our materials, please donate

ACCA News:

ACCA My Exam Performance for non-variant

Applied Skills exams is available NOW

ACCA Options:  “Read the Mind of the Marker” articles

Subscribe to ACCA’s Student Accountant Direct

ACCA CBE 2025 Exams

How was your exam, and what was the exam result?

BT CBE exam was.. | MA CBE exam was..
FA CBE exam was.. | LW CBE exam was..

Donate

If you have benefited from OpenTuition please donate.

PQ Magazine

Latest Comments

  • Kim Smith on IASB Conceptual Framework – Introduction – ACCA Financial Reporting (FR)
  • Farhaan on Project management – ACCA Strategic Business Leader (SBL)
  • Ken Garrett on Professionalism, ethical codes and the public interest – ACCA Strategic Business Leader (SBL)
  • thienan0110 on Interest rate risk management (1) Part 5 – ACCA (AFM) lectures
  • Venoth on Time Series Analysis – ACCA Management Accounting (MA)

Copyright © 2025 · Support · Contact · Advertising · OpenLicense · About · Sitemap · Comments · Log in