Hi sir..help with the following. Which of the following will use job batch costing and why? Plz also explain a little bit. A. Shipbuilder company B.kittchen fitter C.steel producer 4.oil refinery
Most likely would be A because each ship is likely to be different, whereas with steel and oil each unit produced will be the same. (Each kitchen may be different, but the fitter is just fitting kitchens – not producing them.)