The standard rate of material per kg used in calculating contribution is 144/32.
and the rate per kg used in yield is 144/35. why there is a conflict? IS there a mistake or this is correct if this is correct whats the logic behind it?
and the rate per kg used in yield is 144/35. why there is a conflict? IS there a mistake or this is correct if this is correct whats the logic behind it?